King Street Energy

Take a Look

About the Project

Cheshire based King Street Energy needed a new website to showcase their underground salt cavern gas storage project near Northwich in Cheshire.

The Solution

Bella Design created the website using the Parallax scrolling effect, where multiple backgrounds seem to move at different speeds across the screen, creating an interesting browsing experience.

The King Street Energy site is around 245 acres. It will be constructed to store gas in underground cavities leached in the salt layer some 330m below the surface, each cavern will be 100m in diameter, 60m high and 200m apart. The thick salt layer coupled with the overlying marl makes the conditions ideal for gas storage.

Gas storage construction, due to its nature, takes approximately 5 years from starting design to initial operations and approximately 8 years to complete to full storage size.